Venlo I B2 Logistics Centre

Venlo I B2 Logistics Centre

Popeweg 42, Venlo, 5928 SC, Netherlands

Total size:
Property type: Logistics facility
Available date: Available now
The property was constructed in two phases between March 2008 and December 2013. It comprises a total lettable area of 120,627 sqm, including 3,276 sqm of integral office.
ESFR sprinklers
Hybrid car parking
Secure site access
24-7 operations

Ideally suited for warehousing and distribution

With the Venlo I B2 Logistics Centre, Goodman offers a warehouse unique location in Trade Port Noord, which has been the Dutch and European hotspot for years due to its excellent accessibility and multimodal transport options. Indeed, this logistics hall offers excellent connections by road, water, air and rail. Its prime location is strategically situated between the port of Rotterdam and the Ruhr area, with direct access to the Dutch, German and Belgian markets via a multimodal transport network. 

The new rail freight terminal, at only 4 km, has been operational since September 2020. Rail Terminal Greenport Venlo is the largest inland terminal and will have a capacity of 600,000 TEU after full completion. 

Access to consumers is increasingly important. Within a 60-minute truck drive-time, future customers of the Venlo I B2 Logistics Centre have access to: 

  • 5.0 million population
  • 2.3 million households

 

Functional workspace 

  • Available as from February 2022
  • Lettable area: approx. 29,800 sqm 
  • Warehouse area: approx. 29,330 sqm 
  • Office area: approx. 470 sqm
  • Units available as from 9,770 sqm
  • Free height: 10.5 m
  • Warehouse floor load: 50 KN per sqm 
  • Column grid: first 2 x 18 m, then 12 x 22.5 m
  • Certified ESFR sprinkler system
  • Ground-level overhead doors: 3 
  • Dock doors: 30
  • Secured by fence and separate entrance
  • Operational 24/7
  • Car parking space: 100 pcs

 

More than functional workspace

  • BREEAM In-use Good
  • LED lighting with motion sensors
  • Goodman Energy Tracker: smart metering to closely monitor energy consumption
  • 4 EV charging stations (22 kWh)

Access

  • 5 km to A67
  • 2 km to A73
  • 4 km to Rail Terminal Greenport Venlo 
  • 10 km to barge terminal Venlo 
  • 70 km to Maastricht Airport